Method Statement for Culvert Construction

1. Introduction and General Information
This method statement consists of construction of culverts, including material & machineries to be used, casting & construction procedures, quality control tests & verifications, and also the safety precautions to be implemented.
1.1. Location of Works
Locations will be as per the approved construction drawings.
2. Materials
The major materials used for construction of culverts work, but are not limited to the following.
  • 6” X 9” Rubble
  • Concrete
  • Small tools
3. Equipment
The major equipment used for construction of culverts, but are not limited to the following.
  • Tractor
  • JCB
  • Concrete vibrators
  • Vibrating rammers
  • Leveling instrument
  • Other minor tools
4. Safety Management and Control
Safety precaution will be taken complying with the Road Work Traffic Control Manual and as described follows. Every precaution will be taken to avoid any accidents & damages to adjoining properties, workers, and road users.
All workers will be advised to wear helmets, boots, and gloves while working. There will be a stand by vehicle near site always if needed in a case of accident.
The safety officer inspects several times to inspect safety matters.
5. Method and Procedures
Work procedures for construction of culvert described as below.
5.1. Excavation for construction of half culvert will be done by arranging all traffic sign board as per the road work traffic control manual. The Engineer will be requested to inspect & approve the
excavation, and necessary soft ground treatments carry out after all.
5.2. The bed will be prepared maintaining required levels as per the original construction drawings approved by the Engineer and requested from the Engineer to inspect and approve the surface.
5.3. After getting approval for the bed, screed concrete will be placed, after that 6” x 9” rubble wall (Abutments), deck concrete, Parapet wall and finishing work will be carried out respectively.
5.4. Traffic will be diverted on the finished half of the culvert and after arranging all traffic sign boards and other arrangements; the other side excavation will be started and continued as described above.
6. Quality Control
Certain inspections, verifications, and tests will be carried out, to ensure the quality and durability of the product as described in the above procedures, as per the requirements given in the specification.

Comments

  1. I had the pleasure of working closely with Benjamin lee for several years as business partners. During the time that Ben served as the Mortgage Representative for my home also for my business financing and he helped me closing off loans which really helped me in my business today, we were consistently far above goal and this can only be attributable to Ben hard work. I appreciate your hard work also big thanks to your team for helping me with a loan to grow my business. If you are looking for a loan in any such kindly contact Mr Ben on  247officedept@gmail.com or talk to him on whatsapp    +1---989-394-3740 . Mr Ben is an honest loan officer working with a huge number of investors willing to finance any project.Thankfully, over time our relationship grew beyond wok and I’m still happy to call him a trusted friend.  

    ReplyDelete
  2. It is quite beneficial, although think about the facts when it reaches this target. Quality Management Services

    ReplyDelete
  3. I am happy to find this post very useful for me, as it contains lot of information. I always prefer to read the quality content and this thing I found in you post. Thanks for sharing. London refurbishment company

    ReplyDelete
  4. I have been checking out a few of your stories and i can state pretty good stuff. I will definitely bookmark your blog https://westasianetwork.com/ashford-formula-saudi-arabia.php

    ReplyDelete
  5. Civil Projects: Method Statement For Culvert Construction >>>>> Download Now

    >>>>> Download Full

    Civil Projects: Method Statement For Culvert Construction >>>>> Download LINK

    >>>>> Download Now

    Civil Projects: Method Statement For Culvert Construction >>>>> Download Full

    >>>>> Download LINK

    ReplyDelete
  6. Civil Projects: Method Statement For Culvert Construction >>>>> Download Now

    >>>>> Download Full

    Civil Projects: Method Statement For Culvert Construction >>>>> Download LINK

    >>>>> Download Now

    Civil Projects: Method Statement For Culvert Construction >>>>> Download Full

    >>>>> Download LINK Cy

    ReplyDelete

  7. PMP Classroom Training from expert practitioners to pass the PMP® exam on your 1st attempt with best practices

    PMP CLASSROOM TRAINING

    ReplyDelete

Post a Comment

Popular Posts

Field Density Test

METHOD OF INTERNAL & EXTERNAL PLASTERING ON BRICK WALLS & CONCRETE SURFACES

Method of Plastering

CRACK TREATMENT OF THE ASPHALT BINDER COURSE

Survey & levelling