Project Quality Assurance
Quality Assurance Procedures
In order to assure the product
quality, the quality of the following resources will be assured.
1.
Human Resources: Suitable personnel will be deployed to the
processes, based on the qualifications and experience. In addition to that
necessary training will be provided for continuous improvements and new
technologies.
2.
Machines and Equipment's: All the construction machineries and equipment's will be serviced and calibrated periodically as stipulated in the
schedule to make sure the accuracy and proper functioning.
Device
|
Frequency of checks
|
Adjustments
|
Calibration
|
Theodolite
|
Once in 6
month
|
When
Required
|
Annually
|
Level Sets
|
Once in 6
month
|
When
Required
|
-do-
|
5m Tapes
|
Once in 3
months
|
When
Required
|
-do-
|
30m Tapes
|
Once in 3
months
|
When
Required
|
-do-
|
3.
Material: All the construction materials will be assured to comply with the
standards and specifications. Relevant tests will be carried out as stipulated
in the standards, codes and specifications periodically and as and when
required.
Products
|
Frequency of checks
|
Adjustments
|
Test cubes
|
7 days
& 28 days
|
When Required
|
Slump Cone
|
Prior to
concerting
|
When
Required
|
4.
Methods: Shop drawings and method statements will be prepared as per the
drawings, specifications and consultation with specialists.