TENDERING, ESTIMATING AND QUANTITY SURVEYING – PRINCIPLES

  • Quantity Surveying Organization & Practice;
  • Office & Staffing Organization;
  • General procedure in Quantity Surveying office;

Essential to keep the office well organized, so that work is dealt with satisfactory and logical manner.

  • At the start of a new project;
  • all architect’s drawings should be stamped with the office stamp and the date of receipt.
  • All drawings should be listed and carefully examined.
  • Figured dimensions on the drawing should be checked, and any omitted dimensions calculated and inserted on the drawing.
  • If walls and partitions are coloured in different colours, according to type and thickness, it is easier for identification.
  • Any queries on the drawings should be entered on query sheets for clarification from Architect.
  • If quantity surveyor is unfamiliar with materials, components, etc, he should obtain full particulars from manufacturers.
  • If possible, same group of quantity surveyors should be arranged to take all works from inception to completion of the project.
  • This procedure enables the staff to obtain wider and more interesting experience.
  • It is likely to result in improved efficiency through greater familiarity with all the details of the scheme.
  • It is sometimes the practice on large projects to subdivide the taking off work between different quantity surveyors / separate groups.

E.g. subdivision could be:

      • Structure of the building,
      • Joinery and finishes,
      • Services and external works, etc.
      • Some times whole of the taking off works will be undertaken by a single group of staff under the supervision of a Senior surveyor / team leader.
      • After the draft bill is prepared,
      • examining and editing by a partner / senior surveyor.
      • The final documents will be dispatched to tenderers, with a covering letter stating,
      • the date / time / place where the tenders are to be delivered.
      • Where / when the contract drawings can be inspected.
      • How the contractor can visit the site.
      • Request for acknowledgement of receipt of document.

Construction cost management – much more important part of the present day quantity surveying works. This includes;

The keeping of extensive cost records of all passing through the office.

This will assist with cost forecasting of future projects.

Preparation of accurate cost estimate is always form a vital part of the work of a quantity surveying office.

Cash Flow Projections:

  • The client will need to know the likely sums which he will be required to pay the contractor and when they will occur.
  • To meet this need, the quantity surveyor will prepare a schedule of the likely amounts due and their timing.
  • (for this he will use contractor’s approved program of work which submitted with the tender / shortly after its acceptance)
  • but any design variations by the architect can result in changing both to the amounts due and their timing.
  • If these changes are very significant, it should be brought to the attention of the client.
  • Delays in execution of the contract work will also affect the amount and timing of payments.

Financial Reporting:

  • client should be fully informed by the quantity surveyor on all cost aspects of the project. (Particularly where changes are made to the design / sequence of the work during their construction)
  • normally the quantity surveyor is notified of such changes before they are implemented on the site.
  • Therefore he has adequate time to prepare detailed cost comparisons and can inform the client of the likely cost consequences of the changes – including the probable impact on other sections of the work.
  • When more detailed information becomes available on variations, mainly from measurements, quotations or day works, the quantity surveyor can refine his original estimates and update his financial reports to the client.

 

Quality Assurance in quantity surveying:

Quality assurance (QA) is a systematic way of ensuring that organized activities are implemented in the way in which they are planned.

  • Its main purposes are;
  • To meet client requirements.
  • To meet industry requirements.
  • To improve management control with regard to the quality of service.
  • To increase efficiency.

Quality management policy statement of an international quantity surveying practice indicates;

  • To provide the highest possible standard of service to clients,
  • To operate whenever possible quality management system which has been developed in accordance with BS 5750 Part 1 for professional quantity surveying services.
  • To ensure that the personnel using reasonable skill and care, work in accordance with the procedure detailed in the quality manual.
  • To periodically prepare quality reports and reviews of procedures in order that the quality management system may be improved.
  • Provide facilities for clients’ representatives to verify compliances with the quality management system.

General Office Management:

  • Secretarial and clerical staff should be given clearly defined duties and responsibilities.
  • At the same time be encouraged to work as an effective team with sense of loyalty.
  • Telephone messages should be clearly recorded and the messages relayed to the person concerned as quickly as possible.
  • Letters should always be drafted with care; for that following guidelines observed.
  • There should be no possible doubt as to the true intent and meaning of the letter.
  • The wording should be as simple and concise as possible.
  • Where extensive information is entailed, advisable to send a brief letter accompanied by a detailed report / schedule.
  • Reports are normally subdivided in to;
  • Introduction,
  • Body of the report,
  • Conclusion and recommendations.
  • Technical terms should be avoided as far as possible when writing to lay persons.
  • Letters must be free from grammatical and spelling mistakes.
  • Impersonal languages should be avoided.
    • E.g. “I / we consider” is much preferable to “it is considered”.
  • When dispatching correspondences, a check should be made to ensure that all relevant enclosures are sent with the letter.
  • Careful checks should be made to ensure that the correct letter is inserted in the correct envelope.
  • All incoming correspondence and copies of outgoing letters must be carefully filed in a system that permits easy retrieval.
  • All correspondence should be filed in date order, with the most recent at the front of the file.
  • Letter references often include the project reference and the initials of the writer and typist.
  • Minutes of meetings, site records, project details, cost information and other supporting data must be carefully preserved.
  • Another important section of any quantity surveying organization is the information center or office library containing trade literature, reference books, acts of parliament, standards and specifications, etc.

Professional Ethics, Standards and Conduct:

Professional Ethics and Standards:

The RICS (1994) believed that ethics should be taught as part of university surveying degree courses. It could lead to higher professional standards and enhanced attitudes to the need for greater honesty, dedication, care and trust in all professional relationships with clients, other surveyors and general public, and the avoidance of making decisions which are morally wrong.

All members have a moral duty of care when dealing with clients and their affairs. And to exercise the utmost honesty and integrity in all their dealings. Clients can rightly expect that professional men and women will possess a reasonable measure of competence and skill. RICS rules of Conduct states: Members of the institution shall discharge their professional duties to their client and to wider public interest in accordance with the objectives of institution.

Members shall:

  • Ensure that where there is conflict between the interest of the member and that of the client, the interest of the client shall prevail, unless it is at odds with the wider public interest.
  • Ensure that they perform their duties:
  • With integrity and honesty,
  • competently and diligently,
  • by adopting personal and professional standards.
  • any member must not hide any relevant facts from the client of which he should be aware of.
  • Chartered surveyors have to fulfill their client’s high expectations of their standards, which in real word have to be balanced against the surveyor’s price levels and the value for money that they provide.

Comments

  1. This comment has been removed by the author.

    ReplyDelete
  2. Great Post,Nice Information | Bidkon
    We are a AIQS Certified privately-owned construction consultancy working with an extensive and diverse list of clients. Our staff are ardent about the services we deliver and are keen to delivering the highest level of service, value and innovation to our clients.

    ReplyDelete
  3. Thanks for sharing this informative blog. If you are thinking to hire a Quantity Surveyor in London then you can hire PEJA Surveying

    ReplyDelete
  4. Thank you for sharing your thoughts and knowledge on this topic. This is really helpful and informative

    http://thebuildinggroup.co.nz/

    ReplyDelete
  5. I am really enjoying reading your well written articles. It looks like you spend a lot of effort and time on your blog. I have bookmarked it and I am looking forward to reading new articles. Keep up the good work. Building survey and maintenance recommendations.

    ReplyDelete
  6. Wow really a nice and informative blog, Thanks for sharing this useful content with us, If somebody is looking for the best.
    Construction Services Clapham

    ReplyDelete
  7. TC Consultancy -The best quantity surveying Dubai has to offer, this service includes a Quantity surveyors in UAE and BOQ Preparation in Dubai-UAE.for more Project management Consulting Servicesvisit our website

    ReplyDelete
  8. The term Quantity Survey is evolving as Construction Cost Directors/Construction Cost Managers in the Construction Industry. TC Consultancy specializes in customizing its approach for diverse construction projects as per the needs and challenges of each project. for more information you can contact +971 6 557 3924 or visit our webpage. Best Quantity surveyors in UAE

    ReplyDelete
  9. TC Conslutancy provides construction project management and management solutions for Clients in Dubai, the Asia Pacific region, and globally. Construction project management in dubai. for more information you can contact us +971 6 557 3924 or visit our website.

    ReplyDelete
  10. The term Quantity Surveyis evolving as Construction Cost Directors/Construction Cost Managers in the Construction Industry. TC Consultancy specializes in customizing its approach for diverse construction projects as per the needs and challenges of each project. for more information you can contact +971 6 557 3924 or visit our webpage.

    ReplyDelete
  11. TC Consultancy specializes in customizing its approach for diverse construction projects as per the needs and challenges of each project, irrespective of its size and scope. We specialize in Quantity Surveying Services. for more information you can contact our website +971 6 557 3924 visit our webpage

    ReplyDelete
  12. We deliver, manage the complete process which includes the discipline of project planning, project monitoring, managing resources & subcontractors and supporting design deliverables. we are one the best Project management Consultants in UAE.
    Project management Consultants in UAE
    Project management Consulting Services

    ReplyDelete
  13. TC Consultancy: Procurement Strategy in Dubai offering management services. Our Commercial Management Services helps the organization to achieve their desired goal Procurement Strategy in Dubai Project management Consulting Services in Saudi arabia
    i

    ReplyDelete
  14. TC Consultancy provides best quantity surveyor and construction project management solutions for Clients in UAE Construction project management. for more information you can contact us +971 6 557 3924

    ReplyDelete
  15. Nice info.TC Consultancy specializes in customizing its approach for diverse construction projects as per the needs and challenges of each project, irrespective of its size and scope. We specialize, best in Quantity Surveying Services in Saudi arabia . for more information you can contact +971 6 557 3924.

    ReplyDelete
  16. Here I find very good information really very impressive blog.Please click here for
    Pest Control Dwarka Delhi

    ReplyDelete
  17. Nice blog here you will find very good information also..
    Pest Control East Delhi

    ReplyDelete
  18. TC Consultancy specialized in Quantity Surveying Services, Project Management, Project Development, Tenancy and Facility Support Management in Saudi Arabia, Dubai, Sharjah, Kuwait, Qatar, Bahrain, Oman, KSA, UAE

    Established in the year 2005, head office in Sharjah, UAE, TC Consultancy has valuable 15 years of experience in the Architectural, Engineering & Construction industry to its credit through its qualified and experienced professionals.

    The workforce includes Members of the Royal Institution of Chartered Surveyors (RICS), Chartered Institute of Arbitrators, Certified Cost Engineers (AACEI), Architects and multidisciplinary highly skilled engineers with varied experience in the Middle East and other countries.

    ReplyDelete
  19. Cost management in construction and the role of the consultant Quantity Surveyor in Dubai, Sharjah, Saudi Arabia, Kuwait, Qatar, Bahrain, Oman, KSA. Cost management, a function traditionally undertaken by quantity surveyors, therefore remains of critical importance to project success. Business feasibility studies to assess the viability of a scheme prior to design.

    Cost or Commercial Management in construction and the role of the quantity surveyor in delivering the necessary services has developed significantly and continues to evolve to meet the changing needs of clients. This evolution has been driven in part by the impetus for change in procurement and contract strategies generated by construction industry.

    Clients wish to obtain their increasingly more complex projects within budget and on time and to the necessary quality. Cost management, a function traditionally undertaken by quantity surveyors, therefore remains of critical importance to project success.

    CONTACT TCC

    TC CONSULTANCY FZC
    Block P6-132, SAIF Zone,
    Sharjah, UAE.
    Phone: +971 6 557 3924
    Email: info@tccons.ae
    Skype: tccons@outlook.com
    Website: www.tccons.ae

    ReplyDelete
  20. Very informative content..! It is ingeniously combines deep insights with a fresh perspective, delivering a captivating narrative that challenges conventional thinking and inspires new ideas.
    NEBOSH Diploma in UAE


    ReplyDelete
  21. Importance of Stamping and Date Tracking: Stamping architect's drawings with the office stamp and recording the date of receipt ensures clear documentation of when materials were received, providing an organized way to track the project's timeline and prevent misunderstandings or delays.
    Industrial Dust Cleaner
    Centralized Dust Collector

    ReplyDelete
  22. Thorough Examination of Drawings: Careful examination of drawings is critical to avoid any overlooked details that may cause issues later in the project. Ensuring that dimensions are accurate and any missing measurements are added helps reduce errors during construction.
    fume scrubber
    Dust Collector india

    ReplyDelete
  23. Color-Coded Drawings: Using color coding for different wall and partition types makes the drawings much easier to read and understand, particularly when it comes to complex designs. This is a smart practice to quickly identify different elements within a design.
    Industrial Dust Removal india
    Cyclone Dust Collector india

    ReplyDelete
  24. Query Sheets for Clarification: Entering any uncertainties on a query sheet for clarification by the architect is an essential part of ensuring that the final product meets the original design intent and avoids costly mistakes down the line.
    Centrifugal Blowers india
    Shrink Packing machine supplier

    ReplyDelete
  25. Familiarizing with Materials and Components: If the quantity surveyor is not familiar with certain materials or components, taking the initiative to get full details from manufacturers is key to ensuring accuracy. This proactive approach can help avoid delays and guarantee quality results. Shrink wrapping machine supplier
    Centrifugal Blower in delhi

    ReplyDelete
  26. Consistency in Surveying Teams: Keeping the same group of quantity surveyors throughout the project ensures continuity, leading to better communication, deeper knowledge of the project, and a more efficient workflow from start to finish.
    pulse jet bag filter India
    Centrifugal Blower in Manufacturer

    ReplyDelete
  27. Subdividing Work for Large Projects: For larger projects, dividing tasks between different surveyors or teams can help manage the workload more effectively. This approach can ensure that specific areas of the project receive detailed attention, but it’s crucial to maintain strong coordination among all teams.
    Invest in Brands
    Dust Collector

    ReplyDelete

Post a Comment

Popular Posts

Field Density Test

METHOD OF INTERNAL & EXTERNAL PLASTERING ON BRICK WALLS & CONCRETE SURFACES

Method of Plastering

CRACK TREATMENT OF THE ASPHALT BINDER COURSE

Survey & levelling